|
Shedd Project |
||
![]() |
![]() |
![]() |
A good solid 16"x 24" footing under walls | Basement floor with 24" piers in center | Drain system a must before back filling |
![]() |
![]() |
![]() |
Water proofing before Back filling | Rough grading | Basement walls and 20'x14" floor beam |
![]() |
![]() |
![]() |
Main floor wall system | ||
![]() |
![]() |
![]() |
For more information about Office
located at This site designed and maintained by William R. Keeter. WEBMASTER_2000 |